Measurements constitute a horizontal activity, supporting the research components of the project.
Within the framework of the project, the following measurements were carried out:
- ✔ Wind and solar potential measurements at the installation site of the Hybrid Power Station (HPS).
- ✔ Meteorological measurements within the settlement.
- ✔ Temperature and other parameter measurements inside and outside the buildings where interventions were planned.
- ✔ Power quality measurements on the electrical network.
- ✔ Measurements for the assessment of the District Heating system (DHS) .
- ✔ Studies on the impact of the operation of the HPS and the DHS on power quality.